As the main heating pipes have been exposed, identifying flow and return central heating circuits has been possible. Heating "Zones" are being installed the first zone valve has been installed. This one controls the upper level heating zone.
The old consumer unit was removed and two modern MK Sentry units installed;
No comments:
Post a Comment